CLIENT: UNIVERSITY OF TASMANIA
SECTOR: HEALTH
SIZE: ALTERATIONS TO 5 HERITAGE BUILDINGS
VALUE: $2.40 MILLION
PERIOD: 12 WEEKS
UTAS Stage 2 is a fit out of a Nursing and Paramedic training facility to replicate a hospital layout. It also included a lecture room with extensive AV which included; custom built lecterns, presentation equipment, air media, conferencing equipment, interactive touch screen monitors, simulation equipment, hearing loop for hearing impaired. Joinery in UTAS Stage 2 included custom built in joinery, built in nursing lab to identically replicate a hospital environment for training, custom storage and lockers. Ample hoarding, signage, protection and care was a major consideration of the project.