CLIENT: DEPARTMENT OF EDUCATION
SECTOR: GOVERNMENT
VALUE: $650 K
PERIOD: 9 WEEKS
Maitland High School was in need of external safety screens erected throughout the school campus.
The school environment was live and much of the works were conducted during normal hours and
CIP took the utmost care in ensuring the students and faculty were protected and safe from the site areas. Deliveries were made to the grounds before or after school.
This project included external safety screens that were erected to the outside of 2 wings of the 3 level buildings on the school campus. The school was a live environment and appropriate protection had to be installed and Working With Children certification was also factored into this project. CIP was working at heights so plant and equipment had to be carefully managed to protect students and faculty whilst on site. Plant and equipment required protection overnight and on weekends and were kept in a secured locked compound.